The performance of “Tightrope” at the Rakvere Theatre was postponed twice today. Initially, the scheduled performance in the small hall was cancelled due to an actor’s illness. Attendees were offered a replacement performance of “Di, Viv and Rose” in the large hall.

However, the “Di, Viv and Rose” performance was abruptly halted after approximately an hour due to a power outage, leaving the audience experiencing discomfort. The Rakvere Theatre sustained damage during the outage. Photo: Private collection.

Topics: #performance #theatre #rakvere

2 thoughts on “An electrical failure interrupted a theater performance in Rakvere”
  1. “What a frustrating day for those trying to see a show – it’s a shame when things don’t go as planned.”

Leave a Reply

Your email address will not be published. Required fields are marked *